June, 2017
Addition of a mezzanine in the spacious hangar. Upstairs will be an office, downstairs will be a bathroom and workshop. Its pretty disruptive right now but its gonna be great when finished. It will be well insulated, heated & air-conditioned… and well lit! There will be 44 four-foot LED tubes in only 15′ x 30′ of workshop. Many thanks to Tim, Donna, Brandon & Patrick of Topside Construction for the excellent work they have done so far!


September, 2017
The office is ready to move into, furniture is on order. 

The bathroom with shower and an oversize sink is also ready for use.

So is the well lit shop area!


October 2017
Shop set up and ready for action.

June 2018
Finally got the air compressor plumbing fully installed and final electrical connections made. Note also the coffee maker. It never fails that even though I can make a fresh cup right in the hangar, it gets cold because I don’t stop working to finish it. No matter, just heat it back up in the microwave oven. Good for heating up a snack too.

November 2017
Flight instruction, formation briefings and good old fashioned socializing being conducted in the office furnished office.
This strange thing is a decorated imitation propeller. I bought it from an on-line silent auction benefitting Angel Flight. Getting it delivered was an interesting task, getting it hand carried from New Mexico to Boerne by some relatives of the event organizer who happened to be passing through.
Mar 2018
Did a pre-buy inspection on this K-model Mooney for a friend.
September 2018
Big Ass fan installed, really makes the hangar floor and shop area more comfortable in the South Texas summers.
October 2023
Added a mural on the upstairs mezzanine. Mural and video by Dace Kidd of Tyler. Visit her site here: https://dacekidd.com/